Project Definition Readiness Index Applied on Power Station Projects
LAP Lambert Academic Publishing
€39.90
(inklusive MwSt.)
Verfügbarkeit: Titel wird für Sie produziert, Festbezug, bitte vormerken
Zusatztext
ESKOM constantly manages capital projects to sustain its assets (power stations, transmission lines, distribution lines and buildings) and to increase its operational life cycle. The past decade was marked by an increasing number of capital projects for the power utility in South Africa, due to the organisation's objectives to refurbish the Power Station systems as most of them have reached their useful design life cycle. ESKOM had to also expanded its generation and transmission capacity to meet South Africas increases energy demands. ESKOM adapted the Project Definition Readiness Index (PDRI) instrument as part of its Front End Planning (FEP), to address the challenge of poor scope definition resulting in scope creep, project costs escalations and delays. The PDRI provides a quantitative measure of the level of the scope definition of the project. It correlates the level of the scope definition to project success factors.
Autorenportrait
Yolisa Motsepe (Pr Eng), is working for Eskom a Power Utility in South Africa. She works in an Assets Creation environment as a Manager of Complex Project responsible for Front End Planning and managing Complex and Mega Projects of the Power Utility. Her other research interest include Value Engineering.
Weitere Details
Erschienen: 17.04.2019
Umfang: 88 S.
Sprache: ENG
Einband: KT
Format: 0.6 x 22 x 15 cm
ISBN/EAN: 9786139460694
Umbreit-Nr.: 7208080